Vehicle breakdown on PIE (towards Changi Airport) after Clementi Ave 6.
13/09 06:46
|
|
Vehicle breakdown on TPE (towards PIE) after KPE Exit.
13/09 06:38
|
|
Roadworks on Tessensohn Road (towards Balestier Road) after Joo Avenue. Avoid right lane.
13/09 01:24
|
|
Roadworks on Tessensohn Road (towards Joo Avenue) after Balestier Road. Tessensohn Road closed after Balestier Road.
13/09 01:24
|
|
Events
Singapore International Triathlon 2024Date and time: 15 September 2024, 06.00am to 12.00pm Location: Road closure of East Coast Park Service Rd (between Exit 7A to National Sailing Centre) Organiser: Triathlon Association of Singapore Hotline: 9711 1889
Refer to the file below for the road closure map.
|
The Glam Circuit Festival 2024Date and time: 12 September 2024 to 23 September 2024 Organiser: One Kampong Gelam Hotline: 8811 1894
Refer to the file below for the list of road closures and road closure map.
|
Event at St Theresa’s HomeDate and time: 12 September 2024, 09.00am to 13 September 2024, 12.00pm Location: Road closure of Upp Thomson Rd (between Lamp Posts 43 and 39) Hotline: 6256 2532
Refer to the file below for the road closure map.
|
Event at Singapore Sports HubDate and time: 12 September 2024, 08.00am to 9.00pm Location: Left lane of Stadium Dr towards Stadium Rd (between Lamp Posts 46F and 48F) and Stadium Dr towards Stadium Rd (between Lamp Posts 53F and 56F) Hotline: 1800 2440000
Refer to the file below for the road closure map.
|
Event at Parliament HouseDate and time: 12 September 2024, 07.30am to 12.00pm Location: Road closure of Parliament Pl and 2 left lanes closure of High St (between Lamp Post 4 and North Bridge Rd) Hotline: 1800 2240000
Refer to the file below for the road closure map.
|
Event at University Cultural CentreDate: 9 September 2024 to 14 September 2024 Hotline: 1800 7740000
Refer to the file below for the list of road closures and road closure maps.
|
Event at St Francis Xavier Retreat CentreDate and time: 9 September 2024, 09.00am to 13 September 2024, 6.00pm Location: Road closure of Ponggol Seventeenth Ave Hotline: 9776 6123
Refer to the file below for the road closure map.
|
Temporary Closures
Temporary Closure of Pasir Ris Dr 1 (between Pasir Ris Dr 8 and Pasir Ris Central) and Alternative Travelling RoutesPasir Ris Dr 1 between Pasir Ris Dr 8 and Pasir Ris Central is closed from 8 October 2023 to fourth quarter of 2028 to facilitate construction works of Cross Island Line (CRL) Pasir Ris Station.
TPE (PIE) to Pasir Ris Central Estate - Refer to Map A
Pasir Ris Central Estate to TPE (SLE) - Refer to Map B
|
Temporary Closure of Loyang Ave (between Pasir Ris Dr 3 and Loyang Way) and Alternative Travelling RoutesLoyang Avenue between Pasir Ris Dr 3 and Loyang Way is closed from 26 February 2023 to second quarter of 2029 to facilitate construction works of Loyang Station and Loyang Viaduct.
Please plan your journey to avoid the area where possible.
If you are heading to the destinations listed below, you can refer to the respective map for information and use the following alternative routes.
From TPE(PIE) to Loyang Industrial Estate and Changi Village - Refer to Map A
From Loyang Industrial Estate and Changi Village to TPE (SLE) – Refer to Map B
From Tampines Ave 7 / TPE (SLE) to Loyang Industrial Estate and Changi Village - Refer to Map C
From Loyang Industrial Estate and Changi Village to TPE (PIE) / Tampines Ave 7 - Refer to Map D
From ECP to Changi Airfreight Centre, Aviation Logistic Park of Singapore - Refer to Map E
From Changi Airfreight Centre, Aviation Logistic Park of Singapore to ECP - Refer to Map F
|
Temporary shuttle bus services to Loyang Industrial Estate (LIE)/Airport Logistics Park of Singapore (ALPS)/Changi Airfreight Centre (CAC)To facilitate travel to LIE/ALPS/CAC, two shuttle bus services, LCS1 and LCS2, between LIE/ALPS/CAC and Tampines / Punggol towns respectively have been introduced since Thursday, 23 February 2023. There are 2 trips per service during weekdays mornings and evenings. Only EZ-Link cards or contactless banks cards can be used to pay for the flat fare of $3.20 for each trip.
All shuttle bus passengers going into CAC are to ensure that they have a valid pass to enter CAC as there will be no changing of visitor passes allowed at the Police Guard Post along ALPS Avenue. For more information on these bus services, please visit SBS Transit website at https://www.sbstransit.com.sg/news/introduction-of-shuttle-bus-services-lcs1-and-lcs2.
In addition, public transport options are available for travel to LIE/ALPS/CAC from nearby residential towns. Visitor pass exchange is available at the Police Pass Office along Airline Rd. Please see below, or use the MyTransport app to find out more.
|
Temporary Closure at Bukit Timah Expressway (BKE) for Maintenance WorksTo facilitate the maintenance works at BKE, the following will be closed to traffic from 01.00am to 05.00am (daily):
Motorists are advised to drive carefully.
|
Temporary Closure at Kranji Expressway (KJE) for Maintenance WorksTo facilitate the maintenance works at KJE, the following will be closed to traffic from 01.00am to 05.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of Slip Roads at Marina Coastal Expressway (MCE) TunnelTo facilitate maintenance works at MCE Tunnel, the following will be closed to traffic from 12.00am to 05.00am:
Motorists are advised to drive carefully.
|
Temporary Closure at Tampines Expressway (TPE) for Maintenance WorksTo facilitate the maintenance works at TPE, the following will be closed to traffic from 01.00am to 05.00am (daily):
Motorists are advised to drive carefully.
|
Temporary Closure of Sentosa Gateway Tunnel (SGT) for Tunnel Washing WorksTo facilitate maintenance works at SGT, the following will be closed to traffic from 12.00am to 05.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of the Slip Road from AYE (MCE) Exit 13 to Jurong Town Hall RdTo facilitate road resurfacing works along the slip road from AYE (MCE) Exit 13 to Jurong Town Hall Rd, the following will be closed to traffic from 01.00am to 05.00am (daily):
Motorists are advised to drive carefully.
|
Temporary Closure at Seletar Expressway (SLE) Exit Slip Road towards YishunTo facilitate construction works for North South Corridor (NSC), the following will be closed to traffic from 01.30am to 05.30am:
Motorists are advised to drive carefully.
|
To facilitate construction works for North South Corridor (NSC), the following will be closed to traffic from 01.30am to 05.30am:
Motorists are advised to drive carefully.
|
Temporary Closure of Fort Canning Tunnel for System TestingTo facilitate system testing at Fort Canning Tunnel (FCT), the following will be closed to traffic from 11.00pm to 06.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of Woodsville Tunnel (WVT) for Maintenance WorksTo facilitate maintenance works at WVT, the following will be closed to traffic from 12.01am to 05.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of Central Expressway Tunnel (CTE) for Tunnel Maintenance WorksTo facilitate maintenance works at CTE Tunnel, the following will be closed to traffic from 12.00am to 05.00am:
Motorists are advised to drive carefully.
|
To facilitate maintenance works at CTE Tunnel, the following will be closed to traffic from 12.00am to 06.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of Fort Canning Tunnel (FCT) for System TestingTo facilitate system testing works at (FCT), the following will be closed to traffic from 12.01am to 05.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of Upp Serangoon Rd between Upp Serangoon Cres/Upp Serangoon View and Buangkok East Dr/Sengkang East Dr/Buangkok DrTo facilitate the maintenance works at Upp Serangoon Rd, the following will be closed to traffic from 01.30am to 05.00am:
Motorists are advised to drive carefully.
|
Temporary Closure of Slip Roads at Kallang-Paya Lebar Expressway (KPE) TunnelTo facilitate maintenance works at KPE Tunnel, the following will be closed to traffic from 12.00am to 08.00am:
To facilitate maintenance works at KPE Tunnel, the following will be closed to traffic from 12.00am to 05.00am:
Motorists are advised to drive carefully.
|
Traffic Diversion at the Junctions of Ang Mo Kio (AMK) Ave 5 and Ave 6To facilitate the North-South Corridor (NSC) construction works, the traffic lanes at AMK Ave 5 and Ave 6 junctions will be converted to a roundabout from 18 August 2024 to 31 July 2025. Delays expected while traveling along this stretch of AMK Ave 5 and Ave 6.
Motorists are advised to drive carefully.
|
Lane Reduction along Ang Mo Kio (AMK) Ave 6 to facilitate Teck Ghee Station and North-South Corridor Construction WorksTo facilitate Cross Island Line (CRL) Teck Ghee Station and North-South Corridor construction works, Ang Mo Kio (AMK) Ave 6 (about 500m between AMK Ave 1 and AMK Ave 3) will be diverted and reduced to two-lane dual carriageway from 9 Jun 2024 onwards:
Motorists are advised to drive carefully and encouraged to plan for extra travelling time.
|
Traffic Diversion at the Junction of Thomson Rd/Balestier RdTo facilitate the North South Corridor (NSC) construction works, the traffic lanes at Thomson/Balestier Rd junction
Motorists are advised to drive carefully.
|
Traffic Diversion along Marymount Rd (Marymount Flyover)To facilitate the construction of the North-South Corridor, the existing Marymount Flyover will be closed from 8 October 2023 to the end of North-South Corridor construction in 2029. Motorists travelling along Marymount Rd towards the City or Ang Mo Kio will be directed to a new road through a new cross junction intersecting Braddell Rd.
Motorists are advised to drive carefully.
|
Diversion of Thomson Lane and PIE Slip Road Exit 17D towards Thomson RdTo facilitate North-South Corridor construction works, PIE(Changi) Exit 17D slip road towards Thomson Rd will be rerouted via Mount Pleasant Rd to join to Thomson Rd from 23 July 2023 to October 2025. Delays expected while travelling along this stretch of Thomson Rd.
Motorists are advised to drive carefully.
|
Temporary Closure of Ang Mo Kio St 24 to facilitate Cross Island Line (CRL) Teck Ghee Station Construction WorksTo facilitate construction works at Ang Mo Kio St 24, the following will be closed to traffic from 9 September 2022:
Motorists are advised to drive carefully.
|
Temporary Closure at Hougang Central (Minor) Rd for the Construction of Cross Island Line Hougang StationTo facilitate the construction works for Cross Island Line Hougang Central at Hougang Central Rd, the following will be closed to traffic from 12.00am, 28 August 2022 to 2nd Quarter 2029:
Motorists are advised to drive carefully.
|
Temporary Closure of Revenue House Internal Driveway via Thomson RdAs part of NSC works, access to Revenue House internal driveway from Thomson Rd will be closed until December 2024.
Motorists are advised to drive carefully.
|
Temporary Partial Road Closure of Hillview LinkTo facilitate construction works along Hillview Link, a section of the road will be temporarily closed from 22 November 2020 to 4th Quarter 2024. Motorists can use Hillview Rd to connect between Upp Bukit Timah Rd and Hillview Ave. Motorists travelling to developments along Gombak Dr and Gombak Rise are advised to use Gombak Dr.
Motorists are advised to drive carefully.
|
Permanent Closures
Closure of Queen St between Rochor Rd and Ophir RdTo facilitate the construction works for North-South Corridor (NSC), Queen St between Rochor Rd and Ophir Rd will be closed from 1 September 2024. Motorists are advised to use the alternative route via Victoria St to travel from Ophir Rd to Rochor Rd.
Please click here for more information. |
Permanent Road Realignment along Seletar Expressway (SLE) Exit Slip Road Towards YishunTo facilitate the construction of North South Corridor, a section of SLE exit slip road will be realigned from 1 May 2023.
Please click here for more information. |
Kampong Gelam PrecinctTo facilitate Car-Free Zones in the Kampong Gelam precinct, regular road closures will resume at Bussorah St and Baghdad St on weekends, and Haji Lane and Bali Lane throughout the week, from 22 July 2022. Motorists are advised to drive carefully and follow the traffic signage on site.
Please click here for more information. |
Permanent Road Closure of Connaught Drive and Fullerton Road/Anderson BridgeTo facilitate pedestrianisation works to enhance walkability in the Civic District, Connaught Dr and Fullerton Rd/Anderson Bridge will be permanently closed off from 30 December 2021, 12.00am. Motorists are advised to use Parliament Place to access developments within the Civic District and Saint Andrew’s Rd.
Please click here for more information. |
Permanent Road Realignment along Lorong 5 Toa PayohTo facilitate safer vehicular movements as part of the upcoming Silver Zone, a section of Lorong 5 Toa Payoh towards Lorong 4 Toa Payoh (near to the junction of Lorong 5 Toa Payoh/Toa Payoh East) will be realigned on 11 October 2021. This change will be made permanent. Motorists are advised to drive carefully and follow the directional traffic signage on site.
|
Expunction of Jurong Rd
To facilitate the infrastructure development of new Jurong Region Line MRT Viaduct, Jurong Rd will be expunged from 27 September 2020, 12.00am. Motorist are advised to use the alternate road on PIE expressway to travel between Jurong West Ave 2 and Bukit Batok Rd.
Please click here for more information.
|
Liang Seah StTo facilitate Car-Free Zone, regular road closures will resume at section of Liang Seah St from North Bridge Rd to the back lane near Beach Rd every Friday, Saturday, Sunday and Public Holidays, 6.30pm to 12.00am from 6 October 2023. Motorists are advised to drive carefully and follow the traffic signage on site. |
Sections of Punggol Rd and Punggol Point Rd
To facilitate construction works for Punggol Digital District and Punggol Point District, sections of Punggol Rd and Punggol Point Rd will be closed permanently from 23 February 2020.
Please click here for more details.
|
Closure of Slip Road from Rochor Rd to Ophir Rd and alternative U-turn at Serangoon Rd – Rochor Canal Rd Junction
From 3 February 2020, 12.00am, the Slip Road from Rochor Rd to Ophir Rd will be closed. This is to facilitate NSC construction works. Motorists can alternatively make a U-turn at Serangoon Rd – Rochor Canal Rd Junction and enter Ophir Rd via Sungei Rd.
Please refer to Annex for the map.
|
Expunction of SGH Hospital Dr (partial) and Second Hospital Ave (partial)
To facilitate infrastructure development on Singapore General Hospital (SGH) Campus, there will be new network of three separate routes that are not interconnected from 29 December 2019, 05.00am. Motorists are advised to follow the directional traffic signage on site to enter SGH via College Rd, Hospital Dr, Hospital Boulevard or Second Hospital Ave, depending on their destination.
Please click here for more information.
|
One-Way Conversion of Service Road between Malacca St and Market St
From 28 September 2019, 12.00am, the service road (between Malacca St and Market St) will be converted to a one-way road as part of the redevelopment works of the former Golden Shoe Carpark. This is to facilitate and enhance the flow of traffic within the network of roads. Motorists travelling along Market St will no longer be able to turn into the service road and exit via Malacca St. As such, all traffic intending to enter the service road shall only enter via Malacca St and exit via Market St.
Please refer to Annex for the map. |
Expunction of Market St, between Church St and Malacca St and traffic re-routing to Chulia St
From 17 February 2019, 12.01am, part of Market St (between Church St to Malacca St) will be expunged to convert the road to a public park as part of the redevelopment works of the former Golden Shoe car park. The streetscape around Raffles Place will be enhanced to transform the area into a more vibrant and people-friendly green zone in the heart of the Central Business District (CBD). Motorists along Church St heading to Chulia St will no longer be able to access this road and should use D’Almeida St, after Cecil St junction, to reach their destinations.
Please refer to Annex for the map and click here for more information. |
Expunction of Jurong Gateway Link
To facilitate the construction of Jurong Region Line's Jurong East Station, Gateway Link will be expunged from 26 January 2019 at 11.00pm, to amalgamate the two separate land parcels originally separated by Gateway Link. Motorists who previously used this road can now use Jurong East Street 12. The dual 2-lane carriageway of Jurong East St 12 was widened to a dual 3-lane carriageway to provide additional road capacity. Two new traffic signalised junctions were also added to facilitate the rerouting of traffic due to the closure of Gateway Link.
Please refer to Annex [218 Kb] for the map.
|
Expunction of Portion of Canning Rise
The expunged street ceases to be a public street with effect from the same date. Please refer to Annex for the map and click here for more information.
Annex [430 Kb] |
Change in road closure timing at Holland Village
The road closure timing for Lorong Mambong and Lorong Liput will be revised from 6.30pm to 04.00am to 6.30pm to 03.00am (daily) with effect from Wednesday, 31 October 2018.
Click here for more information.
|
Sections of Punggol Rd and Ponggol 17th AveTo facilitate construction works for Punggol Digital District (PDD), sections of Punggol Rd and Ponggol 17th Ave will be closed to vehicular traffic permanently from 26 August 2018. A section of Ponggol 17th Ave will remain open for access to Punggol Way. The northern section of Punggol Rd will also remain open for access to The Punggol Settlement via Punggol Way.
Click here for more information. |
Proposed Expunction of Armenian St (Part)
Motorists are advised to access Armenian St via Loke Yew St. Click here for more information. |
Birch Rd
Every Sunday: 12.00pm to 12.00am Start Date: 15 October 2017
Click here for more information. |
Kerbau Rd, Chander Rd and Dunlop St
Click here for more information. |
Havelock Square
The new passenger pick-up/drop-off point for State Courts users and visitors is along Upper Cross St. Family Justice Courts users and visitors can use the new passenger pick-up/drop-off point along New Market Rd (entrance from Havelock Rd). |
Civic District
From 1 June 2016, only authorized vehicles, including public buses and coaches will be allowed to access Connaught Dr from Stamford Rd. There will be a new roundabout for traffic from Connaught Dr to proceed towards Esplanade Drive or St Andrew's Rd. Cars leaving Esplanade Theatres' basement car park at Connaught Dr will be required to turn right into Stamford Rd. There will be no vehicular access into Coleman St from St Andrew's Rd. Traffic from Parliament Place will be re-routed to Supreme Court Lane to access St Andrew's Rd via Coleman St. Parliament Place will be accessible only to public buses and coaches.
From 1 July 2016, buses and heavy vehicles will not be allowed to enter Fullerton Rd / Anderson Bridge from Collyer Quay / Esplanade Bridge. They will be diverted to Esplanade Dr / Esplanade Bridge.
Click here for map on new traffic arrangements in Civic District. |
Lembu Rd
Click here for more information. |
1 | Road Works on ZEHNDER ROAD
Service Department is LAND TRANSPORT AUTHORITY. For details, please call +65 65853995
Expected Completion Date: 27/12/2024
|
2 | Road Works on ZION ROAD
Service Department is PRIVATE. For details, please call 62500700
Expected Completion Date: 20/9/2024
|
3 | Road Works on ZION ROAD
Service Department is NETLINK TRUST. For details, please call 67182708
Expected Completion Date: 15/12/2024
|
4 | Road Works on ZION ROAD
Service Department is SINGTEL-MANAGED SERVICES MGT and CABLE OPERATIONS. For details, please call -
Expected Completion Date: 30/1/2025
|
5 | Road Works on ZION ROAD
Service Department is SINGTEL-MANAGED SERVICES MGT and CABLE OPERATIONS. For details, please call -
Expected Completion Date: 29/4/2025
|
6 | Road Works on ZION ROAD
Service Department is NETLINK TRUST. For details, please call 64310373
Expected Completion Date: 31/12/2024
|
7 | Road Works on ZUBIR SAID DRIVE
Service Department is PRIVATE. For details, please call 65135781
Expected Completion Date: 31/12/2024
|
1 | Road Works on ZION ROAD
Service Department is PRIVATE. For details, please call 69178301
Expected Start Date: 18/11/2024
|
2 | Road Works on ZION ROAD
Service Department is PRIVATE. For details, please call 68449849
Expected Start Date: 22/9/2024
|
3 | Road Works on ZION ROAD
Service Department is PRIVATE. For details, please call 62500700
Expected Start Date: 21/9/2024
|